Notice from Waste Water Management
The Waste Water Management Team has started flushing laterals in the waste water disposal field east and west of the entry road. Please give this area a wide berth until further notice. /tmc
The Waste Water Management Team has started flushing laterals in the waste water disposal field east and west of the entry road. Please give this area a wide berth until further notice. /tmc
An industrious group of our owners showed up last Sunday to bring ten distribution laterals to the surface in our waste water disposal field. All of the laterals on the west side of the access road (16) have now been brought to the surface. Of the 18 laterals …
Notice from Waste Water Management WWMS Disposal Field Excavations In the spring of 2020 we located, and piped to the surface, 10 waste water distribution laterals. We did this so we would have easy access to these laterals for flushing purposes. The Waste Water Management Team would like …
This is to advise that the new pipes have been installed and the Waste Water System is up and running at standard operating level. The emergency light is now out. Hugh WWMR
Please be advised that we have another cracked pipe in our waste water system. Corewater has been on site to see what parts are needed. Hopefully they will return today and complete the repairs. We have had to shutdown two pumps, hence the red light flashing. The system is quite …
This message is from the Waste Water Management System (WWMS) subcommittee to all LLE owners. We have a request of all our owners to support us in achieving longer run lengths between pump outs for our septic tank. We would ask that we all focus on diverting as much oil, …